Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u934515793/domains/al-dhaw.com/public_html/wp-includes/functions.php on line 6114
al-dhaw - Al-Dhaw Sustainability Energy SPC

As per Oman Standard for Solar PV project on grid , the system should meet the bellow technical requirements at the Point of connection (POC ) :

– The frequency at the POC stays within the range of 47,5Hz to 52,5Hz.
-The voltage at the POC stays within the range 85% to 110 % of the rated voltage.
– Total Harmonic distortion (THD) is:  3% at (as per ASPR) ,or as per DISCO
– Short circuit (Is): 6% of Max switch Capacity.

In case that THD exceed the limit, the electrical filter should be applied after submitting the electrical simulation study.

Please refer OES standard in ASPR

https://www.apsr.om/pdfs/SolarPVSystems/Technical_Guidelines.pdf

https://www.apsr.om/

__________________________________
#solar#renewableenergy
#solar_oman
#omanbusiness
#solar_in_Oman
#renewables
__________________________________