{"id":11798,"date":"2026-06-20T14:28:43","date_gmt":"2026-06-20T10:28:43","guid":{"rendered":"https:\/\/al-dhaw.com\/burimi-300kwp-solar-project-case-study-oman\/"},"modified":"2026-09-24T21:40:57","modified_gmt":"2026-09-24T17:40:57","slug":"burimi-63kwp-solar-project-case-study-oman","status":"publish","type":"post","link":"https:\/\/al-dhaw.com\/ar\/burimi-63kwp-solar-project-case-study-oman\/","title":{"rendered":"Burimi 63 kWp Solar Project \u2014 Case Study"},"content":{"rendered":"<h2>Burimi 63 kWp Solar Project \u2014 Case Study | Al-Dhaw Sustainability Energy<\/h2>\n<p>This case study details the design, installation, and commissioning of a 63 kWp grid-tied solar PV system for <strong>Burimi Trading &#038; Investment Establishment<\/strong>, executed by <strong>\u0627\u0644\u0636\u0648\u0621 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645\u0629<\/strong> \u2014 a leading <strong>solar company in Oman<\/strong>.<\/p>\n<h2>Project Overview<\/h2>\n<ul>\n<li><strong>Client:<\/strong> Burimi Trading &#038; Investment Establishment<\/li>\n<li><strong>System Size:<\/strong> 63 kWp<\/li>\n<li><strong>Location:<\/strong> BURIMI-SYS1 &#038; BURIMI-SYS2, Oman<\/li>\n<li><strong>Completion Date:<\/strong> June 2026<\/li>\n<li><strong>System Type:<\/strong> Grid-tied (On-Grid)<\/li>\n<\/ul>\n<h2>System Design<\/h2>\n<h3>Solar Panels<\/h3>\n<ul>\n<li><strong>Make:<\/strong> JA Solar<\/li>\n<li><strong>Model:<\/strong> JAM72S20 390-400W Mono<\/li>\n<li><strong>String Configuration:<\/strong> 7 strings (4 strings SYS1, 3 strings SYS2)<\/li>\n<\/ul>\n<h3>Inverters<\/h3>\n<ul>\n<li>2 inverters (BURIMI-SYS1 and BURIMI-SYS2)<\/li>\n<li>Zone 3 &#038; 4 AC distribution<\/li>\n<\/ul>\n<h2>Commissioning Test Results<\/h2>\n<p>All strings passed the required tests with excellent results:<\/p>\n<h3>BURIMI-SYS1 (Inverter 1)<\/h3>\n<ul>\n<li><strong>Voc:<\/strong> 522 \u2013 531V (within limits)<\/li>\n<li><strong>Isc:<\/strong> 57.49 \u2013 57.75A<\/li>\n<li><strong>Riso:<\/strong> 17.7 \u2013 19.3 M\u03a9 (excellent insulation)<\/li>\n<li><strong>String 1:<\/strong> Voc 522V, Isc 57.55A, Riso 19.3 M\u03a9 \u2705<\/li>\n<li><strong>String 2:<\/strong> Voc 525V, Isc 57.54A, Riso 18.8 M\u03a9 \u2705<\/li>\n<li><strong>String 3:<\/strong> Voc 531V, Isc 57.75A, Riso 17.7 M\u03a9 \u2705<\/li>\n<li><strong>String 4:<\/strong> Voc 529V, Isc 57.49A, Riso 18.5 M\u03a9 \u2705<\/li>\n<\/ul>\n<h3>BURIMI-SYS2 (Inverter 2)<\/h3>\n<ul>\n<li><strong>Voc:<\/strong> 527 \u2013 571V<\/li>\n<li><strong>Isc:<\/strong> 57.45 \u2013 57.80A<\/li>\n<li><strong>Riso:<\/strong> 17.9 \u2013 22.0 M\u03a9 (excellent)<\/li>\n<li><strong>String 5:<\/strong> Voc 571V, Isc 57.79A, Riso 22.0 M\u03a9 \u2705<\/li>\n<li><strong>String 6:<\/strong> Voc 527V, Isc 57.80A, Riso 20.3 M\u03a9 \u2705<\/li>\n<li><strong>String 7:<\/strong> Voc 530V, Isc 57.45A, Riso 17.9 M\u03a9 \u2705<\/li>\n<\/ul>\n<h2>Key Outcomes<\/h2>\n<ul>\n<li>All 7 strings passed commissioning \u2014 100% success rate<\/li>\n<li>System achieves <strong>15-20% reduction<\/strong> in electricity costs<\/li>\n<li><strong>Payback period:<\/strong> Estimated 4-5 years<\/li>\n<\/ul>\n<h2>Why Burimi Chose Al-Dhaw<\/h2>\n<p>Burimi Trading &#038; Investment Establishment selected <a href=\"https:\/\/al-dhaw.com\/ar\/\">\u0627\u0644\u0636\u0648\u0621 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645\u0629<\/a> for our certified engineering team, use of premium Tier-1 equipment, and end-to-end project management from design to commissioning.<\/p>\n<h2>Conclusion<\/h2>\n<p>The Burimi 63 kWp solar project demonstrates Al-Dhaw&#8217;s capability to deliver high-quality commercial solar installations in Oman. <a href=\"https:\/\/al-dhaw.com\/ar\/\">Contact us<\/a> today for a free consultation on your solar project.<\/p>","protected":false},"excerpt":{"rendered":"<p>Case study of a 63 kWp grid-tied commercial solar system in Oman by AL-DHAW: JA Solar modules, commissioning test results and key outcomes.<\/p>","protected":false},"author":1,"featured_media":11797,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[24,25],"tags":[31,26,28,66],"class_list":["post-11798","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renewable-energy","category-solar-energy","tag-al-dhaw","tag-apsr","tag-renewable-energy-in-oman","tag-solar-farms-in-oman"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.8 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Burimi 63 kWp Solar Project Case Study, Oman | AL-DHAW<\/title>\n<meta name=\"description\" content=\"Case study of a 63 kWp grid-tied commercial solar system in Oman by AL-DHAW: JA Solar modules, commissioning test results and key outcomes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/al-dhaw.com\/ar\/burimi-63kwp-solar-project-case-study-oman\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Burimi 63 kWp Solar Project \u2014 Case Study\" \/>\n<meta property=\"og:description\" content=\"Case study of a 63 kWp grid-tied commercial solar system in Oman by AL-DHAW: JA Solar modules, commissioning test results and key outcomes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/al-dhaw.com\/ar\/burimi-63kwp-solar-project-case-study-oman\/\" \/>\n<meta property=\"og:site_name\" content=\"Al-Dhaw Sustainability Energy\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-20T10:28:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-24T17:40:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/al-dhaw.com\/wp-content\/uploads\/2026\/06\/burimi-solar-project-case-study.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"798\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"salimalrubkhi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@dhawenergy\" \/>\n<meta name=\"twitter:site\" content=\"@dhawenergy\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"salimalrubkhi\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data2\" content=\"\u062f\u0642\u064a\u0642\u0629 \u0648\u0627\u062d\u062f\u0629\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/\"},\"author\":{\"name\":\"salimalrubkhi\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#\\\/schema\\\/person\\\/bce6b2fa6b154dfa47466ef673a44926\"},\"headline\":\"Burimi 63 kWp Solar Project \u2014 Case Study\",\"datePublished\":\"2026-06-20T10:28:43+00:00\",\"dateModified\":\"2026-09-24T17:40:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/\"},\"wordCount\":257,\"publisher\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/burimi-solar-project-case-study.jpg\",\"keywords\":[\"al-dhaw\",\"APSR\",\"renewable energy in Oman\",\"Solar farms in Oman\"],\"articleSection\":[\"Renewable energy\",\"Solar Energy\"],\"inLanguage\":\"ar\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/\",\"name\":\"Burimi 63 kWp Solar Project Case Study, Oman | AL-DHAW\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/burimi-solar-project-case-study.jpg\",\"datePublished\":\"2026-06-20T10:28:43+00:00\",\"dateModified\":\"2026-09-24T17:40:57+00:00\",\"description\":\"Case study of a 63 kWp grid-tied commercial solar system in Oman by AL-DHAW: JA Solar modules, commissioning test results and key outcomes.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/#primaryimage\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/burimi-solar-project-case-study.jpg\",\"contentUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/burimi-solar-project-case-study.jpg\",\"width\":1200,\"height\":798,\"caption\":\"Burimi solar project case study in Oman - commercial installation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/burimi-63kwp-solar-project-case-study-oman\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/al-dhaw.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Burimi 63 kWp Solar Project \u2014 Case Study\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#website\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/\",\"name\":\"Al-Dhaw Sustainability Energy\",\"description\":\"Renewable energy company in Oman\",\"publisher\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/al-dhaw.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#organization\",\"name\":\"Al-Dhaw Sustainability Energy\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/LOGO-AL-DHAW-2.png\",\"contentUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/LOGO-AL-DHAW-2.png\",\"width\":1200,\"height\":675,\"caption\":\"Al-Dhaw Sustainability Energy\"},\"image\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/dhawenergy\",\"https:\\\/\\\/www.instagram.com\\\/dhawenergy\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/dhawenergy\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#\\\/schema\\\/person\\\/bce6b2fa6b154dfa47466ef673a44926\",\"name\":\"salimalrubkhi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/litespeed\\\/avatar\\\/6f06920620f914557997d447fbc84b10.jpg?ver=1790514440\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/litespeed\\\/avatar\\\/6f06920620f914557997d447fbc84b10.jpg?ver=1790514440\",\"contentUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/litespeed\\\/avatar\\\/6f06920620f914557997d447fbc84b10.jpg?ver=1790514440\",\"caption\":\"salimalrubkhi\"},\"sameAs\":[\"https:\\\/\\\/al-dhaw.com\"],\"url\":\"https:\\\/\\\/al-dhaw.com\\\/ar\\\/author\\\/salimalrubkhi\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Burimi 63 kWp Solar Project Case Study, Oman | AL-DHAW","description":"Case study of a 63 kWp grid-tied commercial solar system in Oman by AL-DHAW: JA Solar modules, commissioning test results and key outcomes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/al-dhaw.com\/ar\/burimi-63kwp-solar-project-case-study-oman\/","og_locale":"en_US","og_type":"article","og_title":"Burimi 63 kWp Solar Project \u2014 Case Study","og_description":"Case study of a 63 kWp grid-tied commercial solar system in Oman by AL-DHAW: JA Solar modules, commissioning test results and key outcomes.","og_url":"https:\/\/al-dhaw.com\/ar\/burimi-63kwp-solar-project-case-study-oman\/","og_site_name":"Al-Dhaw Sustainability Energy","article_published_time":"2026-06-20T10:28:43+00:00","article_modified_time":"2026-09-24T17:40:57+00:00","og_image":[{"width":1200,"height":798,"url":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2026\/06\/burimi-solar-project-case-study.jpg","type":"image\/jpeg"}],"author":"salimalrubkhi","twitter_card":"summary_large_image","twitter_creator":"@dhawenergy","twitter_site":"@dhawenergy","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"salimalrubkhi","\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"\u062f\u0642\u064a\u0642\u0629 \u0648\u0627\u062d\u062f\u0629"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/#article","isPartOf":{"@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/"},"author":{"name":"salimalrubkhi","@id":"https:\/\/al-dhaw.com\/#\/schema\/person\/bce6b2fa6b154dfa47466ef673a44926"},"headline":"Burimi 63 kWp Solar Project \u2014 Case Study","datePublished":"2026-06-20T10:28:43+00:00","dateModified":"2026-09-24T17:40:57+00:00","mainEntityOfPage":{"@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/"},"wordCount":257,"publisher":{"@id":"https:\/\/al-dhaw.com\/#organization"},"image":{"@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/#primaryimage"},"thumbnailUrl":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2026\/06\/burimi-solar-project-case-study.jpg","keywords":["al-dhaw","APSR","renewable energy in Oman","Solar farms in Oman"],"articleSection":["Renewable energy","Solar Energy"],"inLanguage":"ar"},{"@type":"WebPage","@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/","url":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/","name":"Burimi 63 kWp Solar Project Case Study, Oman | AL-DHAW","isPartOf":{"@id":"https:\/\/al-dhaw.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/#primaryimage"},"image":{"@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/#primaryimage"},"thumbnailUrl":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2026\/06\/burimi-solar-project-case-study.jpg","datePublished":"2026-06-20T10:28:43+00:00","dateModified":"2026-09-24T17:40:57+00:00","description":"Case study of a 63 kWp grid-tied commercial solar system in Oman by AL-DHAW: JA Solar modules, commissioning test results and key outcomes.","breadcrumb":{"@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/#primaryimage","url":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2026\/06\/burimi-solar-project-case-study.jpg","contentUrl":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2026\/06\/burimi-solar-project-case-study.jpg","width":1200,"height":798,"caption":"Burimi solar project case study in Oman - commercial installation"},{"@type":"BreadcrumbList","@id":"https:\/\/al-dhaw.com\/burimi-63kwp-solar-project-case-study-oman\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/al-dhaw.com\/"},{"@type":"ListItem","position":2,"name":"Burimi 63 kWp Solar Project \u2014 Case Study"}]},{"@type":"WebSite","@id":"https:\/\/al-dhaw.com\/#website","url":"https:\/\/al-dhaw.com\/","name":"\u0627\u0644\u0636\u0648\u0621 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645\u0629","description":"\u0634\u0631\u0643\u0629 \u0637\u0627\u0642\u0629 \u0645\u062a\u062c\u062f\u062f\u0629 \u0641\u064a \u0633\u0644\u0637\u0646\u0629 \u0639\u064f\u0645\u0627\u0646","publisher":{"@id":"https:\/\/al-dhaw.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/al-dhaw.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/al-dhaw.com\/#organization","name":"\u0627\u0644\u0636\u0648\u0621 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645\u0629","url":"https:\/\/al-dhaw.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/al-dhaw.com\/#\/schema\/logo\/image\/","url":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2025\/06\/LOGO-AL-DHAW-2.png","contentUrl":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2025\/06\/LOGO-AL-DHAW-2.png","width":1200,"height":675,"caption":"Al-Dhaw Sustainability Energy"},"image":{"@id":"https:\/\/al-dhaw.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/dhawenergy","https:\/\/www.instagram.com\/dhawenergy","https:\/\/www.linkedin.com\/company\/dhawenergy"]},{"@type":"Person","@id":"https:\/\/al-dhaw.com\/#\/schema\/person\/bce6b2fa6b154dfa47466ef673a44926","name":"salimalrubkhi","image":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/al-dhaw.com\/wp-content\/litespeed\/avatar\/6f06920620f914557997d447fbc84b10.jpg?ver=1790514440","url":"https:\/\/al-dhaw.com\/wp-content\/litespeed\/avatar\/6f06920620f914557997d447fbc84b10.jpg?ver=1790514440","contentUrl":"https:\/\/al-dhaw.com\/wp-content\/litespeed\/avatar\/6f06920620f914557997d447fbc84b10.jpg?ver=1790514440","caption":"salimalrubkhi"},"sameAs":["https:\/\/al-dhaw.com"],"url":"https:\/\/al-dhaw.com\/ar\/author\/salimalrubkhi\/"}]}},"_links":{"self":[{"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/posts\/11798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/comments?post=11798"}],"version-history":[{"count":3,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/posts\/11798\/revisions"}],"predecessor-version":[{"id":12145,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/posts\/11798\/revisions\/12145"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/media\/11797"}],"wp:attachment":[{"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/media?parent=11798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/categories?post=11798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/tags?post=11798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}