{"id":10683,"date":"2021-09-21T12:38:40","date_gmt":"2021-09-21T08:38:40","guid":{"rendered":"https:\/\/al-dhaw.com\/?p=10683"},"modified":"2026-06-20T14:42:22","modified_gmt":"2026-06-20T10:42:22","slug":"solar-pv-project-technical-limitation","status":"publish","type":"post","link":"https:\/\/al-dhaw.com\/ar\/solar-pv-project-technical-limitation\/","title":{"rendered":"Solar PV Project Technical Requirements in Oman"},"content":{"rendered":"<h2>Solar PV Project Technical Requirements in Oman \u2014 Complete Guide<\/h2>\n<p>This guide covers the key technical requirements for solar PV projects in Oman as specified by the Authority for Public Services Regulation (NEDC\/DCRP) and Nama Distribution Company. Understanding these requirements is essential for any solar installation in the Sultanate.<\/p>\n<h2>Key Regulatory Bodies<\/h2>\n<p>Two main entities govern solar PV installations in Oman:<\/p>\n<ul>\n<li><strong>NEDC\/DCRP (Authority for Public Services Regulation):<\/strong> Sets policies, technical standards, and tariff structures for grid-connected solar systems<\/li>\n<li><strong>Nama Distribution Company:<\/strong> Handles the connection study, meter installation, and grid integration approval<\/li>\n<\/ul>\n<h2>Technical Requirements for Grid Connection<\/h2>\n<h3>1. System Design Requirements<\/h3>\n<ul>\n<li>System design must comply with IEC 62446 (Grid connected PV systems)<\/li>\n<li>PVsyst simulation report showing expected annual energy yield<\/li>\n<li>Single-line diagram showing all electrical components<\/li>\n<li>Structural assessment of the mounting surface (roof or ground)<\/li>\n<\/ul>\n<h3>2. Component Requirements<\/h3>\n<ul>\n<li><strong>Solar Panels:<\/strong> Must be IEC 61215 \/ 61730 certified. Minimum efficiency requirements apply<\/li>\n<li><strong>Inverters:<\/strong> Must be IEC 62116 certified with anti-islanding protection<\/li>\n<li><strong>Mounting Structure:<\/strong> Must withstand Oman wind loads (up to 140 km\/h in coastal areas)<\/li>\n<li><strong>Metering:<\/strong> Bi-directional meter for net metering, provided by Nama<\/li>\n<\/ul>\n<h3>3. Protection Requirements<\/h3>\n<ul>\n<li>Overvoltage protection (Type 1 or 2 SPD)<\/li>\n<li>Overcurrent protection (DC and AC side breakers)<\/li>\n<li>Earth fault protection with RCD<\/li>\n<li>Anti-islanding protection (automatic disconnection on grid failure)<\/li>\n<li>DC isolator switch accessible for emergency services<\/li>\n<\/ul>\n<h2>Consumption Study (50% Rule)<\/h2>\n<p>Nama Distribution determines the maximum system size based on a consumption study. The rule allows up to 50% of the customer&#8217;s annual consumption to be offset by solar generation. This study requires 12 months of electricity bills for accurate assessment.<\/p>\n<h2>Approval Process<\/h2>\n<ol>\n<li>Submit application to NEDC\/DCRP via an approved consultant engineer<\/li>\n<li>Conduct consumption study through Nama<\/li>\n<li>Submit detailed engineering design (PVsyst, SLD, structural)<\/li>\n<li>Receive approval and connection permit<\/li>\n<li>Install system by NEDC\/DCRP-approved contractor<\/li>\n<li>Commissioning test and grid connection<\/li>\n<\/ol>\n<h2>Temperature Considerations for Oman<\/h2>\n<p>Solar panel performance degrades in high temperatures. In Oman, panels can reach up to 60\u00b0C surface temperature. Choose panels with a low temperature coefficient (preferably below -0.35%\/\u00b0C) to maintain good performance in summer conditions.<\/p>\n<h2>Consult a Professional<\/h2>\n<p>For professional guidance on solar PV project requirements in Oman, contact <a href=\"https:\/\/al-dhaw.com\/ar\/\">\u0627\u0644\u0636\u0648\u0621 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645\u0629<\/a> \u2014 a leading solar company in Oman with certified engineering consultants.<\/p>","protected":false},"excerpt":{"rendered":"<p>Complete guide to solar PV project technical requirements in Oman. APSR regulations, grid connection standards, component specs, and approval process.<\/p>","protected":false},"author":3,"featured_media":10684,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[24,25],"tags":[31,26,30,27,28,29],"class_list":["post-10683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renewable-energy","category-solar-energy","tag-al-dhaw","tag-apsr","tag-authority-for-public-services-regulation","tag-oes-standard","tag-renewable-energy-in-oman","tag-solar-energy-in-oman"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.8 (Yoast SEO v28.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Solar PV Technical Requirements in Oman | AL-DHAW<\/title>\n<meta name=\"description\" content=\"Technical requirements for solar PV projects in Oman. Grid connection APSR compliance string sizing and IEC standards.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/al-dhaw.com\/ar\/solar-pv-project-technical-limitation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Solar PV Technical Requirements Oman | AL-DHAW\" \/>\n<meta property=\"og:description\" content=\"Technical requirements for solar PV projects in Oman. Grid connection APSR compliance string sizing and IEC standards.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/al-dhaw.com\/ar\/solar-pv-project-technical-limitation\/\" \/>\n<meta property=\"og:site_name\" content=\"Al-Dhaw Sustainability Energy\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-21T08:38:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-20T10:42:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/al-dhaw.com\/wp-content\/uploads\/2021\/09\/short-circuit-analyses.png\" \/>\n\t<meta property=\"og:image:width\" content=\"606\" \/>\n\t<meta property=\"og:image:height\" content=\"532\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Salim Al-Rubkh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Solar PV Project Technical Requirements in Oman\" \/>\n<meta name=\"twitter:creator\" content=\"@dhawenergy\" \/>\n<meta name=\"twitter:site\" content=\"@dhawenergy\" \/>\n<meta name=\"twitter:label1\" content=\"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629\" \/>\n\t<meta name=\"twitter:data1\" content=\"Salim Al-Rubkh\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data2\" content=\"\u062f\u0642\u064a\u0642\u062a\u0627\u0646\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/\"},\"author\":{\"name\":\"Salim Al-Rubkh\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#\\\/schema\\\/person\\\/ffee24b855e3ed8682de01026d59e8ba\"},\"headline\":\"Solar PV Project Technical Requirements in Oman\",\"datePublished\":\"2021-09-21T08:38:40+00:00\",\"dateModified\":\"2026-06-20T10:42:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/\"},\"wordCount\":364,\"publisher\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/short-circuit-analyses.png\",\"keywords\":[\"al-dhaw\",\"APSR\",\"Authority for Public Services Regulation\",\"OES standard\",\"renewable energy in Oman\",\"Solar energy in Oman\"],\"articleSection\":[\"Renewable energy\",\"Solar Energy\"],\"inLanguage\":\"ar\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/\",\"name\":\"Solar PV Technical Requirements in Oman | AL-DHAW\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/short-circuit-analyses.png\",\"datePublished\":\"2021-09-21T08:38:40+00:00\",\"dateModified\":\"2026-06-20T10:42:22+00:00\",\"description\":\"Technical requirements for solar PV projects in Oman. Grid connection APSR compliance string sizing and IEC standards.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/short-circuit-analyses.png\",\"contentUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/short-circuit-analyses.png\",\"width\":606,\"height\":532,\"caption\":\"Short-circuit analysis for solar PV grid connection in Oman\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/solar-pv-project-technical-limitation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/al-dhaw.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solar PV Project Technical Requirements in Oman\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#website\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/\",\"name\":\"Al-Dhaw Sustainability Energy\",\"description\":\"Renewable energy company in Oman\",\"publisher\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/al-dhaw.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#organization\",\"name\":\"Al-Dhaw Sustainability Energy\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/LOGO-AL-DHAW-2.png\",\"contentUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/LOGO-AL-DHAW-2.png\",\"width\":1200,\"height\":675,\"caption\":\"Al-Dhaw Sustainability Energy\"},\"image\":{\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/dhawenergy\",\"https:\\\/\\\/www.instagram.com\\\/dhawenergy\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/dhawenergy\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/#\\\/schema\\\/person\\\/ffee24b855e3ed8682de01026d59e8ba\",\"name\":\"Salim Al-Rubkh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/litespeed\\\/avatar\\\/9337f971dc56b77c1e1b13f2815ff3e5.jpg?ver=1790516424\",\"url\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/litespeed\\\/avatar\\\/9337f971dc56b77c1e1b13f2815ff3e5.jpg?ver=1790516424\",\"contentUrl\":\"https:\\\/\\\/al-dhaw.com\\\/wp-content\\\/litespeed\\\/avatar\\\/9337f971dc56b77c1e1b13f2815ff3e5.jpg?ver=1790516424\",\"caption\":\"Salim Al-Rubkh\"},\"url\":\"https:\\\/\\\/al-dhaw.com\\\/ar\\\/author\\\/herems\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Solar PV Technical Requirements in Oman | AL-DHAW","description":"Technical requirements for solar PV projects in Oman. Grid connection APSR compliance string sizing and IEC standards.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/al-dhaw.com\/ar\/solar-pv-project-technical-limitation\/","og_locale":"en_US","og_type":"article","og_title":"Solar PV Technical Requirements Oman | AL-DHAW","og_description":"Technical requirements for solar PV projects in Oman. Grid connection APSR compliance string sizing and IEC standards.","og_url":"https:\/\/al-dhaw.com\/ar\/solar-pv-project-technical-limitation\/","og_site_name":"Al-Dhaw Sustainability Energy","article_published_time":"2021-09-21T08:38:40+00:00","article_modified_time":"2026-06-20T10:42:22+00:00","og_image":[{"width":606,"height":532,"url":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2021\/09\/short-circuit-analyses.png","type":"image\/png"}],"author":"Salim Al-Rubkh","twitter_card":"summary_large_image","twitter_title":"Solar PV Project Technical Requirements in Oman","twitter_creator":"@dhawenergy","twitter_site":"@dhawenergy","twitter_misc":{"\u0643\u064f\u062a\u0628 \u0628\u0648\u0627\u0633\u0637\u0629":"Salim Al-Rubkh","\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"\u062f\u0642\u064a\u0642\u062a\u0627\u0646"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/#article","isPartOf":{"@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/"},"author":{"name":"Salim Al-Rubkh","@id":"https:\/\/al-dhaw.com\/#\/schema\/person\/ffee24b855e3ed8682de01026d59e8ba"},"headline":"Solar PV Project Technical Requirements in Oman","datePublished":"2021-09-21T08:38:40+00:00","dateModified":"2026-06-20T10:42:22+00:00","mainEntityOfPage":{"@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/"},"wordCount":364,"publisher":{"@id":"https:\/\/al-dhaw.com\/#organization"},"image":{"@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/#primaryimage"},"thumbnailUrl":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2021\/09\/short-circuit-analyses.png","keywords":["al-dhaw","APSR","Authority for Public Services Regulation","OES standard","renewable energy in Oman","Solar energy in Oman"],"articleSection":["Renewable energy","Solar Energy"],"inLanguage":"ar"},{"@type":"WebPage","@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/","url":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/","name":"Solar PV Technical Requirements in Oman | AL-DHAW","isPartOf":{"@id":"https:\/\/al-dhaw.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/#primaryimage"},"image":{"@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/#primaryimage"},"thumbnailUrl":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2021\/09\/short-circuit-analyses.png","datePublished":"2021-09-21T08:38:40+00:00","dateModified":"2026-06-20T10:42:22+00:00","description":"Technical requirements for solar PV projects in Oman. Grid connection APSR compliance string sizing and IEC standards.","breadcrumb":{"@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/#primaryimage","url":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2021\/09\/short-circuit-analyses.png","contentUrl":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2021\/09\/short-circuit-analyses.png","width":606,"height":532,"caption":"Short-circuit analysis for solar PV grid connection in Oman"},{"@type":"BreadcrumbList","@id":"https:\/\/al-dhaw.com\/solar-pv-project-technical-limitation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/al-dhaw.com\/"},{"@type":"ListItem","position":2,"name":"Solar PV Project Technical Requirements in Oman"}]},{"@type":"WebSite","@id":"https:\/\/al-dhaw.com\/#website","url":"https:\/\/al-dhaw.com\/","name":"\u0627\u0644\u0636\u0648\u0621 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645\u0629","description":"\u0634\u0631\u0643\u0629 \u0637\u0627\u0642\u0629 \u0645\u062a\u062c\u062f\u062f\u0629 \u0641\u064a \u0633\u0644\u0637\u0646\u0629 \u0639\u064f\u0645\u0627\u0646","publisher":{"@id":"https:\/\/al-dhaw.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/al-dhaw.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/al-dhaw.com\/#organization","name":"\u0627\u0644\u0636\u0648\u0621 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0633\u062a\u062f\u0627\u0645\u0629","url":"https:\/\/al-dhaw.com\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/al-dhaw.com\/#\/schema\/logo\/image\/","url":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2025\/06\/LOGO-AL-DHAW-2.png","contentUrl":"https:\/\/al-dhaw.com\/wp-content\/uploads\/2025\/06\/LOGO-AL-DHAW-2.png","width":1200,"height":675,"caption":"Al-Dhaw Sustainability Energy"},"image":{"@id":"https:\/\/al-dhaw.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/dhawenergy","https:\/\/www.instagram.com\/dhawenergy","https:\/\/www.linkedin.com\/company\/dhawenergy"]},{"@type":"Person","@id":"https:\/\/al-dhaw.com\/#\/schema\/person\/ffee24b855e3ed8682de01026d59e8ba","name":"Salim Al-Rubkh","image":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/al-dhaw.com\/wp-content\/litespeed\/avatar\/9337f971dc56b77c1e1b13f2815ff3e5.jpg?ver=1790516424","url":"https:\/\/al-dhaw.com\/wp-content\/litespeed\/avatar\/9337f971dc56b77c1e1b13f2815ff3e5.jpg?ver=1790516424","contentUrl":"https:\/\/al-dhaw.com\/wp-content\/litespeed\/avatar\/9337f971dc56b77c1e1b13f2815ff3e5.jpg?ver=1790516424","caption":"Salim Al-Rubkh"},"url":"https:\/\/al-dhaw.com\/ar\/author\/herems\/"}]}},"_links":{"self":[{"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/posts\/10683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/comments?post=10683"}],"version-history":[{"count":7,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/posts\/10683\/revisions"}],"predecessor-version":[{"id":11822,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/posts\/10683\/revisions\/11822"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/media\/10684"}],"wp:attachment":[{"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/media?parent=10683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/categories?post=10683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/al-dhaw.com\/ar\/wp-json\/wp\/v2\/tags?post=10683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}